This summer Bear Metal Plant 1 had its flat roof torn off, replaced the wood structure and had a new membrane put on top of it to secure it for the future from damage and/or leaks. After the asbestos was removed from the roof, the boarded up windows along side the building/roof were replaced with brand new glass and ventilation windows.